Gwangju Songjeong Station is at the center of a proposed 3.94 million square meter redevelopment plan in the newly integrated Gwangju-Jeonnam Special City. The NOVA Integrated Master Plan would combine 3.54 million square meters around the station and Songjeong’s old downtown with a 400,000 square meter former Kumho Tire factory site. The proposal is intended to connect the station, industrial land and surrounding communities rather than treat them as separate projects.
The plan is also linked to a separate 8.26 million square meter semiconductor megacluster planned on the former military airport site. Samsung, SK and Amkor are cited as prospective participants in that industrial area. The city’s stated aim is to make Songjeong Station an industrial gateway, but the available material describes a planning initiative rather than a completed investment package. Total project costs are to be calculated in stages after the master plan is prepared.
The station’s current transport conditions are a central reason for the proposal. Namdo Ilbo reported that the station received a D grade in a Ministry of Land, Infrastructure and Transport service assessment because its space is limited. The station also lacks dedicated boarding areas for buses and taxis, concentrating vehicles along the restricted access routes on Sangmu-daero. The city plans to connect the redevelopment with the existing KTX Investment Promotion District and prepare for higher passenger demand if the semiconductor industrial complex proceeds.
Initial measures include a skywalk in front of the station, dedicated public transport boarding areas and commercial facilities linked to the 1913 Songjeong Station Market. The former tire factory site is envisioned as a future industrial district combining corporate, research and startup functions. The declining old downtown would become a community-oriented district focused on pedestrian conditions and commercial revitalization. The city has launched a NOVA Future City Team, with the proposed project period running from 2026 to 2030.
- NOVA planning area
- 3.94 million square meters
- Linked military airport site
- 8.26 million square meters
- Proposed project period
- 2026 to 2030
